Overlaping Scheduled - Schedules & Zones / Create & Edit Schedules - Rachio Community

Overlaping Scheduled

post by Jsn0327 on Sep 14, 2017

Is it possible to configure the rachio irrigation controller to ignore a scheduled runtime if another schedule overlaps it and the zone has already run? For example, I have two schedules set. One runs all zones for 45 minutes twice a week. A second schedule runs only Zone 1 every other day for 20 minutes. There are days in which the zone 1 schedule runs right after the 45 minute schedule, which isn’t needed. I could setup a manual schedule for zone 1 and select which days to run it, but I figured that the controller would be smart enough to know that zone 1 doesn’t need another 20 minutes of water on the days that all zones receive 45 minutes? The two schedules are set to start at the same time. Thanks.

1.5k views

post by jkb on Sep 14, 2017

I don’t know of a way to set up the zone 1 schedule to get skipped when the zone has already been watered on the same day. Perhaps it could be done with an integration script, maybe someone else will comment.

I would simply remove zone 1 from your all zone schedule and adjust the zone 1 schedule duration to compensate, if you want a different watering frequency for zone 1.

You might want to change your zone 1 start time if you use weather intelligence ‘skip’ features. I have seen reports in this community that skips may affect other schedules that start at the same time.